To ensure safe and effective connection of microgeneration systems to the Electric Utility Distribution System, a Guide for Interconnection has been prepared. The Guide book outlines installation and operation of a microgeneration system in the Medicine Hat electric service area.
Homeowner’s considering the installation of a microgeneration system are required to obtain an electric permit through the Planning, Building and Development Department (403.529.8374) in addition to meeting the protocol requirements.
| Microgeneration Single Line Diagram | ||
| Microgeneration Application Form | ||
| Microgenerator Requirements | ||
| Net Billing Connection Agreement For Microgenerators |